facebook twitter youtube linkedin

News

20 February 2026 | EFICE

Construction of the S19 expressway between Rzeszów Południe and Babica with EU funding

The project includes the construction of a 10.27-kilometre new section of the S19 along with a tunnel, the “Babica” interchange, MOPs, engineering facilities, safety systems and pro-environmental solutions. The General Directorate of National Roads and Highways received over PLN 1.49 billion in EU support for its implementation.

The new section is part of the S19 route, which is part of the expanded TEN-T core network. The investment runs through the municipalities of Boguchwała and Czudec, connecting to the existing Rzeszów Południe interchange and ending at the “Babica” interchange. The project is being implemented with the support of the European Funds for Infrastructure, Climate, Environment 2021-2027. The planned completion of construction work (entire scope of the project) is Q3 2029.

Scope of work

The project includes a wide range of design and construction activities, including:

  • Construction of a two-lane expressway with two lanes and an emergency lane in each direction,
  • Construction of the “Babica” road interchange,
  • Implementation of numerous engineering structures, including flyovers, viaducts, tunnel, culverts,
  • Construction of MOP Lutoryż I and II,
  • A collision-free crossing over the tracks along with the R-2 traffic circle,
  • Installation of noise barriers and special protections for bats,
  • Construction of a helipad for LPR helicopters,
  • Establishment of a Tunnel Management Center with full equipment,
  • Construction of animal crossings, rainwater drainage systems and environmental protection infrastructure,
  • Construction and reconstruction of road lighting, storm sewers and colliding technical infrastructure,
  • Installation of process ducts, traffic organization systems, BRD elements, as well as the Traffic Management System on the road and in the tunnel.

The Rzeszow Południe – Babica section is a continuation of the existing S19 and an integral part of a larger transport route leading to the border crossing in Barwinek.

Project objectives

The implementation of the investment is of key importance for the region and the entire transport network of Poland. The objectives of the project include:

  • Increasing mobility and travel comfort by integrating the route into the TEN-T network,
  • Improving communication accessibility of the Subcarpathian region, the country and international links,
  • Improving the flow of people and goods, increasing the efficiency of road transport and reducing bottlenecks,
  • Relieving the burden on existing infrastructure and improving the quality of life for residents by reducing traffic in built-up areas,
  • Increasing the level of safety for traffic participants through new technical standards,
  • Improving transit traffic flow and reducing travel times,
  • Addressing transportation exclusion and providing climate-resilient infrastructure,
  • Reducing emissions by optimizing route routing and improving transportation corridor capacity.

Benefits for the region and the country

The investment will bring tangible benefits:

  • Faster and safer travel between southern Poland and the national border,
  • Development of the local and regional economy through improved transportation accessibility,
  • An increase in the investment attractiveness of Podkarpackie,
  • Improving the living conditions of residents in adjacent areas,
  • Increasing Poland’s importance in European transport corridors,
  • Raising infrastructure standards in accordance with TEN-T requirements.

Project data

  • Program: European Funds for Infrastructure, Climate, Environment 2021-2027
  • Project number FENX.05.03-IP.02-0002/25
  • Title Construction of S19 Rzeszów – Barwinek expressway, section Rzeszów Południe – Babica
  • Beneficiary: General Directorate of National Roads and Motorways.
  • Total cost according to UoD: PLN 3,033,486,089.04
  • Eligible cost: PLN 1,756,065,858.81
  • EU funding: PLN 1,492,655,979.98
Udostępnij

EFICE

Update of the regulations for the call for projects for the Intermodal Transport competition under the FEnIKS program 07 May 2026 | EFICE
Update of the regulations for the call for projects for the Intermodal Transport competition under the FEnIKS program

A change has been introduced in the Project Selection Regulations for FENX.05.06-IP.02-001/24 (competitive call for Priority FENX.05 Support for the Transport Sector from the ERDF, Measure FENX.05.06 Intermodal Transport) to remove information on the division of allocations between individual regions (i.e. more developed, transitional, less developed). More details can be found in the article.

More arrow
Częstochowa Central Railway Station with EU funding. CEUTP has signed an agreement with PKP S.A. 06 May 2026 | EFICE
Częstochowa Central Railway Station with EU funding. CEUTP has signed an agreement with PKP S.A.

The Center for EU Transport Projects has signed an agreement to subsidize the reconstruction of the Częstochowa Główna railway station. The investment will receive nearly PLN 100 million from European Funds.

More arrow
Support from funds for the purchase of modern vehicles for the Road Transport Inspectorate 06 May 2026 | EFICE
Support from funds for the purchase of modern vehicles for the Road Transport Inspectorate

We take care of safety on Polish roads. We have transferred more than PLN 27 million from the European Funds for Infrastructure, Climate, Environment 2021-2027 (EFICE) program for the project entitled “Strengthening the Potential of the Road Transport Inspection II”.

More arrow
Selection for co-financing of the non-competitive project entitled “FEnIKS Technical Assistance for GKZ for 2025”, implemented by the Ministry of Culture and National Heritage, as the General Conservator of Monuments 29 April 2026 | EFICE
Selection for co-financing of the non-competitive project entitled “FEnIKS Technical Assistance for GKZ for 2025”, implemented by the Ministry of Culture and National Heritage, as the General Conservator of Monuments

On August 26, 2025, the Centre for EU Transport Projects, acting as the Intermediate Body for Measure 8.1 of the European Funds for Infrastructure, Climate, Environment programme for 2021-2027, approved the positive result of the evaluation of the project selected in a non-competitive manner entitled “FEnIKS Technical Assistance for GKZ for 2025”, implemented by the Ministry of Culture and National Heritage, as the General Conservator of Monuments, for the total amount of PLN 4,977,120.12.

More arrow

Contact us

Contact for Beneficiaries

  • submitting applications
  • questions about the programs
contact for the beneficiaryarrow

Information points


Contact form and dedicated
contactfor the media and for citizens

information pointsarrow

Office CUPT

Plac Europejski 2, 00-844 Warszawa

Monday – Friday
hours: 8:15 – 16:15

logotyp - Fundusze Europejskie
logotyp - Rzeczpospolita Polska
logotyp - CUPT
logotyp - Europejski Fundusz Strukturalne i Inwestycyjne

Website co-funded: from the Cohesion Fund as part of the technical assistance of the Operational Programme Infrastructure and Environment 2014-2020, from the Cohesion Fund as part of the technical assistance of the European Funds for Infrastructure, Climate, Environment Programme 2021-2027 and from the European Regional Development Fund as part of the technical assistance of the European Funds for Eastern Poland Programme 2021-2027

scroll back to top